55012 - 1979
January
| 1 - | 1A17 12:50 Leeds - Kings Cross. |
| 2 - | 1S12 05:50 King's Cross - Aberdeen, from Doncaster to Edinburgh (ex
31417 - 109 down Doncaster). Haymarket TMD. 1E21 17:00 Edinburgh - Kings Cross. |
| 3 - | 1N02 09:30 King's Cross - Newcastle. |
| 4 - | |
| 5 - | |
| 6 - | Haymarket TMD. 1E08 08:17 Edinburgh - Newcastle (60 minute delay Edinburgh - 47542 forward). Casualty report states: Driver's reports draught panel missing and refused to go any further. Conclusions: 23.02.79 DME KX states: No record of any attention given and in view of the complete lack of information I am unable to make any useful comments. Haymarket TMD. 1E14 10:40 Aberdeen - King’s Cross, "The Aberdonian" from Edinburgh (9 minute delay Doncaster). Casualty report states: Loss of power. Conclusions: 26.02.79 DME KX states: Unable to fault at Doncaster or when subsequently checked at Finsbury Park Depot and in traffic - in view of the fact that no further trouble was experienced with this locomotive I am left wondering whether a PEF on the coaching stock, caused by weather conditions, resulted in tripping of the locomotive's PEF relay and loss of power. This might suggest the locomotive was removed at Doncaster, however, no forwarding loco is recorded though Chronicles does have 55012 present on Doncaster TMD the following day. |
| s7 - | Doncaster TMD. |
| 8 - | Finsbury Park TMD. Stopped 12:30 - 'B' exam. |
| 9 - | Finsbury Park TMD. 'B' exam. |
| 10 - | Finsbury Park TMD. 'B' exam - to traffic 20:20. |
| 11 - | Finsbury Park TMD. 1Sxx King's Cross - Edinburgh. Haymarket TMD. 1E35 20:20 Edinburgh - King's Cross, to York (45024 forward). |
| 12 - | |
| 13 - | 1A10 08:04 Bradford - King's Cross, to Doncaster. 1S12 05:50 King's Cross - Aberdeen, from Doncaster to Edinburgh (ex 31417 - 60 late). Move seems unlikely as it mirrors that on 02/01. |
| s14 - | 1A15 16:40 Newcastle - King's Cross (via Stockton). |
| 15 - | 1E14 10:40 Aberdeen - King’s Cross, "The Aberdonian" from Edinburgh. |
| 16 - | ASLEF 24 hour strike. Finsbury Park TMD. |
| 17 - | 5B15 13:05 Peterborough West Yard - Ferme Park (empty vans). |
| 18 - | ASLEF 24 hour strike. |
| 19 - | 1A11 08:20 Newcastle - King's Cross. 1S31 15:00 Kings Cross - Aberdeen, to Edinburgh (45 late Newcastle). Haymarket TMD. |
| 20 - | 1E01 07:05 Edinburgh - Kings Cross. 1L17 18:04 King's Cross - Bradford (scratch stock due to bad weather - restricted to 90 mph). |
| s21 - | |
| 22 - | 1A29 16:16 Newcastle - Kings Cross. |
| 23 - | ASLEF 24 hour strike. Finsbury Park TMD. Stopped 00:50 - 'B' exam. |
| 24 - | Finsbury Park TMD. 'B' exam. |
| 25 - | ASLEF 24 hour strike. Finsbury Park TMD. 'B' exam - to traffic 15:30. |
| 26 - | 1A30 17:30 Bradford - King's Cross. |
| 27 - | 1E14 10:40 Aberdeen - King's Cross,
"The Aberdonian" from Edinburgh. King's Cross loco. 'LD125' exam - to traffic 21:30. 1L22 23:15 King's Cross - Bradford, to Peterborough (58 minute delay Peterborough - 31408 forward 28/01). Casualty report states: Boiler defective - suspect boiler water suction pipe frozen. Conclusions: DME KX states: Very severe weather conditions at the time of this casualty. |
| s28 - | Peterborough TMD. Repairs - loco left standing in shed and after time boiler found to be working satisfactorily. (0B01 Peterborough - King's Cross). 1L12 14:40 King's Cross - Harrogate. 1A18 18:50 Leeds - King's Cross. |
| 29 - | |
| 30 - | Haymarket TMD. 1E35 20:20 Edinburgh - King's Cross. |
| 31 - | 1S17 09:00 King's Cross - Edinburgh. |
February
| 1 - | 1S17 09:00 King's Cross - Edinburgh. |
| 2 - | 1S17 09:00 King's Cross - Edinburgh (14 late Newcastle). |
| 3 - | 1L03 09:04 King's Cross - Leeds.
PIC 1S66 21:00 King's Cross - Edinburgh. |
| s4 - | 1L06 10:40 King's Cross - Bradford, to Leeds. |
| 5 - | 1N02 /1A29
caped. Haymarket TMD. 1E14 10:40 Aberdeen - King’s Cross, "The Aberdonian" from Edinburgh. |
| 6 - | 1N02 /1A29 caped. |
| 7 - | 1N02 /1A29 caped. |
| 8 - | 1N02 /1A29
caped. Finsbury Park TMD. Stopped 13:30 - 'C' exam. |
| 9 - | Finsbury Park TMD. 'C' exam. |
| 10 - | Finsbury Park TMD. 'C' exam. To traffic 05:30. |
| s11 - | Finsbury Park TMD. Stopped 14:00 - speedometers. To traffic 20:00. |
| 12 - | 1N02 /1A29
caped. 1A15 10:20 Newcastle - King's Cross. 1L15 16:08 Kings Cross - York. |
| 13 - | 1N02 /1A29 caped. |
| 14 - | 1N02 /1A29
caped. Haymarket TMD. 1V92 09:40 Edinburgh - Plymouth, to York. |
| 15 - | 1N02 /1A29 caped. |
| 16 - | 1N02 /1A29
caped. 1A45 22:55 Newcastle - Kings Cross. |
| 17 - | 1L05 10:04 Kings Cross - York.
PIC 1A22 14:13 York - Kings Cross. |
| s18 - | |
| 19 - | |
| 20 - | |
| 21 - | King's Cross Loco. 'A' exam. 1D02 12:04 King's Cross - Hull. 1A28 16:45 Hull - King's Cross. |
| 22 - | 1A11 08:20 Newcastle - King's Cross. 1D04 16:42 King's Cross - Hull, "The Hull Executive". |
| 23 - | Doncaster TMD. Out of fuel - due to industrial dispute. 1E14 10:40 Aberdeen - King’s Cross, "The Aberdonian" (from Doncaster). |
| 24 - | 1N12 23:55 King's Cross - Newcastle
(82 minute delay Thirsk - 40147 assist forward 25/02). Casualty report states: loss of power (No.2 engine already pegged out). |
| s25 - | Gateshead TMD. Repairs - No.1 main generator cable overheated due to loose connection. |
| 26 - | |
| 27 - | 1A40 20:30 Newcastle - Kings Cross. |
| 28 - | 1D04 16:42 KX - Hull, "The Hull Executive". 1D62 21:20 Hull - Doncaster. |
March
| 1 - | To Doncaster Works - final Light repair (due 01/03). No.2 power unit 455 dephased - power units No.1 442 replaced by 429 & No.2 455 replaced by 425, bogies No.1 9000-31 replaced by 9000-45 & No.2 9000-32 replaced by 9000-46, all traction motor units were replaced and boiler 5087/J3238 was given an Unclassified repair. |
| 2 - | Doncaster Works (2 bay Crimpsalls - radiator housings removed). |
| 3 - | Doncaster Works (2 bay Crimpsalls). |
| s4 - | Doncaster Works (2 bay Crimpsalls). |
| 5 - | Doncaster Works (2 bay Crimpsalls - power units removed and lifted). |
| 6 - | Doncaster Works (2 bay Crimpsalls). |
| 7 - | Doncaster Works (2 bay Crimpsalls). |
| 8 - | Doncaster Works (2 bay Crimpsalls). |
| 9 - | Doncaster Works (2 bay Crimpsalls). |
| 10 - | Doncaster Works (2 bay Crimpsalls). |
| s11 - | Doncaster Works (2 bay Crimpsalls). |
| 12 - | Doncaster Works (2 bay Crimpsalls). |
| 13 - | Doncaster Works (2 bay Crimpsalls). PIC |
| 14 - | Doncaster Works (2 bay Crimpsalls). |
| 15 - | Doncaster Works (2 bay Crimpsalls). |
| 16 - | Doncaster Works (2 bay Crimpsalls). |
| 17 - | Penmanshiel Tunnel
collapse
& severe weather disruption. Doncaster Works (2 bay Crimpsalls). |
| s18 - | Doncaster Works (2 bay Crimpsalls). |
| 19 - | Doncaster Works (2 bay Crimpsalls). |
| 20 - | Doncaster Works (2 bay Crimpsalls). |
| 21 - | Doncaster Works (2 bay Crimpsalls). |
| 22 - | Doncaster Works (2 bay Crimpsalls - wheeled, then to paint shop for nose end painting). |
| 23 - | Doncaster Works (paint shop). |
| 24 - | Doncaster Works (paint shop). |
| s25 - | Doncaster Works (paint shop). |
| 26 - | Doncaster Works (2 bay Crimpsalls). |
| 27 - | Doncaster Works (weigh house). |
| 28 - | Doncaster Works (test house). |
| 29 - | Doncaster Works (weigh house). |
| 30 - | Doncaster Works (2 bay Crimpsalls). |
| 31 - | Released from Doncaster works. |
April
| s1 - | 5L20 Doncaster - Leeds (loco on test after classified repair). |
| 2 - | To Doncaster Works - Rectification. Loss or power - this was rectified. Doncaster Works (weigh house). |
| 3 - | Doncaster Works (outside paint shop). |
| 4 - | Doncaster Works (booked for test run, however loco suffered CCB fault). |
| 5 - | Doncaster Works. |
| 6 - | Doncaster Works (outside 4 bay). |
| 7 - | Released from Doncaster Works. Doncaster TMD. 0N21 Doncaster - York (test run - noted York 13:40). 1N21 York - Tyne Yard. 0D21 Tyne Yard - Doncaster. Doncaster TMD (noted 18:00). |
| s8 - | Doncaster TMD. 1N00 09:30 King's Cross - Newcastle, from Doncaster (ex 55005). Gateshead TMD. |
| 9 - | Gateshead TMD. 0D01 Gateshead - York (hauling 37082). York TMD (18:00). |
| 10 - | (0B02 York - Finsbury Park). Finsbury Park TMD. Stopped 16:30 - No.1 generator u/s. For works attention 20:00. |
| 11 - | Finsbury Park TMD. |
| 12 - | To Doncaster Works - Rectification. No.1 end generator cut out switch burnt out, No.1 & No.2 load regulator leaking oil, oil to be cleaned from back of No.2 cubicle, No.2 bogie 9000-46 No.4 traction motor throwing solder, all traction motor sealing ducting contaminated with oil and 'foreign body' found in machine - all repairs carried out and No.4 traction motor exchanged. Doncaster Works (weigh house then to 4 bay Crimpsalls). |
| 13 - | Released from Doncaster Works. Doncaster TMD. 'A' exam. |
| 14 - | 1A03 07:30 Leeds - Kings Cross. King's Cross Loco. PIC 1L22 23:15 King's Cross - Bradford, to Peterborough (8 minute delay Peterborough - 46044 forward 15/04). Casualty report states: Defective boiler - ignition fuse and holder adrift. |
| s15 - | Peterborough TMD. Repairs - boiler ignition fuse refitted and boiler tested. (0B01 Peterborough - King's Cross). 1L11 14:04 Kings Cross - York. York TMD. |
| 16 - | York TMD. 1A08 08:00 York - King's Cross. King's Cross Loco. 'LD125' exam - to traffic 13:20. 1L11 14:04 King’s Cross - York (12 minute delay Peterborough). Casualty report states: Header tank level low (both tanks pumped up and loco worked forward). Conclusions: 05.06.79 DME KX states: Locomotive only two weeks ex Classified Repair - in view of other reports of cooling system trouble with the No.2 engine water the locomotive was returned for rectification on 22.04.79. I understand subsequently that incorrect settings were confirmed. York TMD. Repairs - Regional Control request to examine loco but could not be faulted. |
| 17 - | York TMD. 1A22 14:13 York - Kings Cross. P.Ref 1S66 20:15 Kings Cross - Edinburgh, to Newcastle. |
| 18 - | 1E14 14:50 Berwick - Kings Cross. Finsbury Park TMD. Stopped 22:00 - footstep to weld. |
| 19 - |
Finsbury Park TMD. Repairs. To traffic 12:00. 1L15 16:08 King's Cross - York (via Knottingley). |
| 20 - | 0L50 (York) - Holbeck. Holbeck TMD. Arrive 01:25 0A12 06:40 Holbeck - Neville Hill. 5A04 Neville Hill - Harrogate. 1A04 09:04 Harrogate - King's Cross, to Leeds (55018 forward). 1A14 10:55 Leeds - Kings Cross. 1D04 16:42 King's Cross - Hull, "The Hull Executive". 1D62 21:00 Hull - Doncaster. 1A41 21:20 Bradford - Kings Cross, from Doncaster. |
| 21 - | 1S17 09:00 King's Cross - Berwick, to
Newcastle. 1E21 17:53 Berwick - Kings Cross. P.Ref |
| s22 - |
Finsbury Park TMD. Stopped 02:00 - No.1 power unit 429 'leg out of bed'. |
| 23 - |
Finsbury Park TMD. For works attention 09:00. |
| 24 - | To Doncaster Works - Unclassified repair. Power units No.1 429 'C2' piston through crankcase & No.2 425 reported high water temperature, both load regulators leaking oil and boiler 5087/J3238 reported locking out - 429 replaced by 435 all other faults were rectified. |
| 25 - | Doncaster Works (4 bay Crimpsalls - No.1 unit removed). |
| 26 - | Doncaster Works (4 bay Crimpsalls - units fitted). |
| 27 - | Doncaster Works (test house). |
| 28 - | Doncaster Works. |
| s29 - | Doncaster Works. |
| 30 - | Doncaster Works (weigh house). |
May
| 1 - | Doncaster Works (weigh house). |
| 2 - | Released from
Doncaster Works. 1N04 13:25 King's Cross - Newcastle.. |
| 3 - | 1L22 23:00 King's Cross - Bradford, to Leeds. |
| 4 - | 0L22 Leeds - Holbeck. Holbeck TMD. Arrive 03:30. 0A14 09:35 Holbeck - Leeds. 1A14 10:55 Leeds - King's Cross. 1S34 18:00 Kings Cross - Newcastle. |
| 5 - | 1L09 12:45 King's
Cross - Bradford.
P.Ref 1A30 17:30 Bradford - Kings Cross |
| s6 - | 1S31 15:00 Kings Cross - Newcastle. |
| 7 - | 1G35 Newcastle - Scarborough,
throughout. 1G23 18:16 Scarborough - Newcastle. |
| 8 - | 1E05 09:50 Berwick - King's Cross. |
| 9 - | 1A40 20:30 Newcastle - King's Cross. |
| 10 - | 0L50 (?) - Holbeck. Holbeck TMD. Arrive 11:00. |
| 11 - | Holbeck TMD. 0D57 00:26 Holbeck - Leeds. 1D57 00:40 Leeds - Doncaster. York TMD (08:30-18:00). |
| 12 - | |
| s13 - | 1A06 12:05 York - Kings Cross (via Selby West Jn, Castleford, Normanton, Hare Park Jn and South Emsall). |
| 14 - | New
timetable period 1S27 07:25 Plymouth - Edinburgh, from York. |
| 15 - | 1L43 14:05 Kings Cross - York. 1A31 18:11 York - King's Cross. |
| 16 - |
1A08 08:05 York - King's Cross. Finsbury Park TMD. Stopped 12:30 - 'B' exam and main generator flashed over. |
| 17 - | Finsbury Park TMD. 'B' exam & repairs |
| 18 - | Finsbury Park TMD. 'B' exam & repairs |
| 19 - | Finsbury Park TMD. 'B' exam & repairs |
| s20 - | Finsbury Park TMD. 'B' exam & repairs |
| 21 - | Finsbury Park TMD. 'B' exam & repairs. To traffic 15:30. 1L45 18:05 Kings Cross - York. |
| 22 - | |
| 23 - | Heaton TMD. |
| 24 - | 1L41 10:05 Kings Cross - York. 1A22 14:11 York - Kings Cross. |
| 25 - | Haymarket TMD. |
| 26 - | |
| s27 - | |
| 28 - | 1N12 00:02 King's Cross - Newcastle. |
| 29 - | 1A91 17:50 Newcastle - King's Cross (additional). PIC |
| 30 - |
Finsbury Park TMD. Stopped 00:05 - brake blocks. To traffic 04:30. 1S60 20:00 King's Cross - Aberdeen, to Edinburgh (via Carlisle). |
| 31 - | Dunbar shuttles. |
June
| 1 - | 1D04 17:05 King's Cross - Hull, "The Hull Executive". PIC |
| 2 - | 5A00 18:28 Clifton CS - Ferme Park (ECS). PIC |
| s3 - | 1L22 23:00 King's Cross - Bradford, to Leeds. |
| 4 - | 0L22 Leeds - Holbeck. Holbeck TMD. Arrive 03:00. |
| 5 - | Holbeck TMD. 0D01 09:10 Holbeck - Doncaster. To Doncaster Works - Rectification. Power units No.1 435 engine hour recorder full of oil & No.2 425 drive shaft to main generator sheared and No.2 main generator flash-over damage - 435 had the hour recorder exchanged, 425 had a replacement phasing case fitted and No.2 generator was replaced. |
| 6 - | Doncaster Works. |
| 7 - | Doncaster Works. |
| 8 - | Doncaster Works. |
| 9 - | Doncaster Works. |
| s10 - | Doncaster Works (yard). P.Ref |
| 11 - | Doncaster Works (yard - No.2 power unit removed). |
| 12 - | Doncaster Works. |
| 13 - | Doncaster Works (4 bay
Crimpsalls - power unit fitted). Released from Doncaster Works. |
| 14 - | Doncaster TMD. 'A' exam. |
| 15 - | 1S66 20:15 King's Cross - Edinburgh (via Carlisle). |
| 16 - | Haymarket TMD. 1E39 22:10 Edinburgh - King's Cross, to Peterborough (via Carlisle - 23 minute delay Peterborough 17/06). Casualty report states: Locomotive out of fuel (due to weekend diversions). |
| s17 - |
Peterborough TMD. Refuelled - 700 gallons supplied. (0B02 Peterborough - Finsbury Park). Finsbury Park TMD. Stopped 12:30 - 'B' exam. |
| 18 - |
Finsbury Park TMD. 'B' exam. |
| 19 - | Finsbury Park TMD. 'B' exam - to traffic 15:00. 1L45 18:05 King’s Cross - York. |
| 20 - | 1A04 07:00 Hull - King's Cross, "The Hull
Executive" (26 minute delay en-route). Casualty report states: Flashover on main generator. Conclusions: 20.07.79 DME KX states: Note that this locomotive suffered further flashovers and is now in Main Works with a suspect No.4 traction motor. It would appear that this was the first signs of trouble that would hound 55012 for the foreseeable future... Finsbury Park TMD. Stopped 11:15 - main generator flashed over. |
| 21 - |
Finsbury Park TMD. Repairs. |
| 22 - | Finsbury Park TMD. Repairs. |
| 23 - |
Finsbury Park TMD. Repairs - to traffic 04:30. 1S12 05:50 King's Cross - Edinburgh (55006 pilot Doncaster-Darlington on test - via Carlisle) . PIC P.Ref Haymarket TMD. 1E46 16:27 Edinburgh - Newcastle (via Carlisle - 18 minute delay Carlisle). Casualty report states: Flashover - worked forward with No.2 engine pinned out (possible GC52 air valve broken). Conclusions: 19.07.79 DME KX states: The defective air valve was of the later 'plastic' type and was handed to the CM&EE's representative, Mr. Holden, during his visit to Finsbury Park on 27.06.79. However, subsequent to this casualty this locomotive had suffered at least two further flashovers and following investigation in traffic by the CM&EE's representative Mr. Edwards is now in Doncaster Works with a suspect No.4 traction motor. Gateshead TMD. |
| s24 - | (Gateshead TMD). |
| 25 - | (Gateshead TMD). 5A40 Heaton - Newcastle. P.Ref 1A40 20:30 Newcastle - Kings Cross. |
| 26 - | Finsbury Park TMD. Stopped 06:10 - main generator flashed over (flashover damaged cleaned up, nine brush holders in No,2 main generator renewed & GC2 air valve renewed. |
| 27 - | Finsbury Park TMD. Repairs. |
| 28 - | Finsbury Park TMD. Repairs. |
| 29 - | Finsbury Park TMD. Repairs. |
| 30 - | Finsbury Park TMD. Repairs - to traffic 16:00. |
July
| s1 - | |
| 2 - | 1A00 06:06 York - Kings Cross. 1D02 12:05 King's Cross - Hull. 1A28 16:30 Hull - King's Cross. Finsbury Park TMD. Stopped 21:00 - main generator flashed over. |
| 3 - | Finsbury Park TMD. Repairs. |
| 4 - | Finsbury Park TMD. Repairs. |
| 5 - | Finsbury Park TMD. Repairs. |
| 6 - | Finsbury Park TMD. Repairs. |
| 7 - | Finsbury Park TMD. Repairs. |
| s8 - | Finsbury Park TMD. Repairs. |
| 9 - | Finsbury Park TMD. Repairs - to traffic 21:00. |
| 10 - | 1A35 12:15 York - King's Cross. |
| 11 - | 1L00 01:10 King's Cross - Leeds. 0L00 Leeds - Holbeck. Holbeck TMD. Arrive 07:25. 0D01 15:59 Holbeck - Doncaster. Doncaster TMD. |
| 12 - | Doncaster TMD. 1N21 08:54 Doncaster - Tyne Yard (test train). 1D21 13:12 Tyne Yard - Doncaster. To Doncaster Works - Unclassified repair. Fault in earth detection unit: not picking up above earth thus causing main generators and traction motors to flashover - the power earth fault protection resistance was replaced and earth fault relay adjusted. Doncaster Works (weigh house). |
| 13 - | Released from Doncaster Works (PM). |
| 14 - | (1D62 03:55 Doncaster - Hull). 1A04 07:00 Hull - King’s Cross, "The Hull Executive". Finsbury Park TMD. 1D04 17:05 King's Cross - Hull, "The Hull Executive" (30 minute delay at Little Bytham). Casualty report states: Flashover and loss of power - driver shut down No.2 engine and worked forward on No.1 engine only. Conclusions: 17.08.79 DME KX states: this locomotive was released from works on 14.08.79 but flashover occurred again on its second trip and has been returned yet again for further investigation. |
| s15 - | 1D62 04:05 Doncaster - Hull. 1A01 08:30 Hull - Kings Cross (via Spalding). Finsbury Park TMD. Stopped 16:30 - No.2 power engine flashover damage. |
| 16 - | Finsbury Park TMD. Locomotive taken out of traffic - for works attention 12:00. Shopping proposal states: suspect No.4 traction motor. |
| 17 - | (Finsbury Park TMD). |
| 18 - | (Finsbury Park TMD). |
| 19 - | To Doncaster Works - Unclassified repair. Both main generators and all traction motors to be checked for flashover damage - earth fault relay rechecked, adjusted and resistance replaced. No.1 main generator overhauled to three-monthly standard and No.2 main generator replaced. No.s 1, 2, 5 & 6 traction motors were repaired and No.s 3 & 4 were replaced. |
| 20 - | Doncaster Works (weigh house). |
| 21 - | Doncaster Works. |
| s22 - | Doncaster Works. |
| 23 - | Doncaster Works (4 bay Crimpsalls - lifted). |
| 24 - | Doncaster Works (weigh house). |
| 25 - | Doncaster Works. |
| 26 - | Released from
Doncaster Works. 5xxx (test run - via Askern & Knottingley). Hexthorpe Bridge. |
| 27 - | Hexthorpe Bridge. 0B02 Doncaster - Finsbury Park (with 55009). Finsbury Park TMD. |
| 28 - | To Doncaster Works - Rectification. No.2 main generator flashed over badly, commutator blackened under No.2 bogie 9000-46 and flashover damage to No.1 main generator - flashover damage on both bogies was repaired. Field divert resistances were repaired and both main generators and all traction motors were overhauled. |
| s29 - | Doncaster Works. |
| 30 - | Doncaster Works (weigh house). |
| 31 - | Doncaster Works. |
August
| 1 - | Doncaster Works. |
| 2 - | Doncaster Works (4 bay Crimpsalls - lifted). |
| 3 - | Doncaster Works. |
| 4 - | Doncaster Works. |
| s5 - | Doncaster Works. |
| 6 - | Doncaster Works (yard). |
| 7 - | Doncaster Works (rectification to traction motor repairs). |
| 8 - | Doncaster Works (test house). |
| 9 - | Doncaster Works. |
| 10 - | Released from
Doncaster Works. Hexthorpe Bridge. |
| 11 - | Hexthorpe Bridge. |
| s12 - | Hexthorpe Bridge. |
| 13 - | Hexthorpe Bridge. |
| 14 - | Hexthorpe Bridge. To traffic by 16:00. Doncaster TMD. 0B02 Doncaster - Finsbury Park. Finsbury Park TMD. |
| 15 - | 1D62 03:55 Doncaster - Hull. 1A04 07:00 Hull - King’s Cross, "The Hull Executive". 1L43 14:05 Kings Cross - York, to Peterborough (20 minute delay Peterborough - 47370 forward). Casualty report states: Flashover No.1 main generator. Conclusion: 02.10.79 DME KX states: This locomotive had a history of flashover troubles being returned to works several times for investigation before the cause was eventually traced in traffic as due to a traction motor contactor intermittently cutting out. The cause of this mal operation is in dispute, the CM&EE's representative, Mr. Edwards, stating it was in electrical feed to the contactor EP valve coil & BREL blaming blockage of the air supply line. 0D01 Peterborough - Doncaster. To Doncaster Works - Unclassified repair. Both main generators and all traction motors severe flashover damage - all traction motors were removed and replaced by a reconditioned set. All circuits were meggered, meter boards fitted for trial and No.1 main generator was replaced. |
| 16 - | Doncaster Works (4 bay Crimpsalls). |
| 17 - | Doncaster Works (4 bay Crimpsalls - both power units removed). |
| 18 - | Doncaster Works (4 bay Crimpsalls - both power units removed). |
| s19 - | Doncaster Works (4 bay Crimpsalls - both power units removed). PIC |
| 20 - | Penmanshiel diversion opens. Doncaster Works (4 bay Crimpsalls - lifted). |
| 21 - | Doncaster Works (4 bay Crimpsalls - both units refitted). |
| 22 - | Doncaster Works. |
| 23 - | Doncaster Works (weigh house). |
| 24 - | Doncaster Works (test house). |
| 25 - | Doncaster Works. |
| s26 - | Doncaster Works. |
| 27 - | Doncaster Works (4 bay Crimpsalls - No.1 power unit removed). |
| 28 - | Doncaster Works (4 bay Crimpsalls - unit refitted). |
| 29 - | Doncaster Works (weigh house). |
| 30 - | Doncaster Works
(reception sidings). 0Z00 Doncaster - Grantham (on test). 0Z00 Grantham - Doncaster. PIC Released from Doncaster Works. |
| 31 - | 1L44 16:05 King's
Cross - York (10 minute delay en-route). Casualty report states: Locomotive working forward on one engine only, examination at at York revealed severe flashover damage. 1A34 19:56 York - Kings Cross |
September
| 1 - | 1L00 01:10 King's Cross - Leeds. York TMD. |
| s2 - | |
| 3 - | To Doncaster Works - Rectification. Severe flashover damage to No.2 main generator: cause of flashover damage to be investigated, ETH contactors and circuitry to be checked, function of ETH to be checked on load bank, locomotive weight to be checked on weighbridge. On completion of repairs a test to be arranged, test meters to be incorporated in circuits to indicate out of balance voltage, main generator voltage and ETH voltage - No.1 main generator was overhauled and No.2 main generator was replaced. Doncaster Works (4 bay Crimpsalls). |
| 4 - | Doncaster Works (weigh house). |
| 5 - | Doncaster Works. |
| 6 - | Doncaster Works (test house). |
| 7 - | Doncaster Works. |
| 8 - | Doncaster Works. |
| s9 - | Released from Doncaster Works. |
| 10 - | Hexthorpe Bridge. |
| 11 - | Hexthorpe Bridge. |
| 12 - | 1D00 08:05 King's Cross - Hull. To Doncaster Works - Unclassified repair. No.3 traction motor contactor continually dropping out, circuits to be checked, test lamps to be put on locomotive and load bank test to be run - the air pipe to motor contactor was repaired, interlocks in motor circuit were checked and adjusted. The locomotive was load tested and a fully loaded test run was completed. |
| 13 - | Doncaster Works. |
| 14 - | Released from Doncaster Works. 0L01 Doncaster - York. 1A35 12:15 York - King's Cross (piloting 55011). 1D08 19:35 Kings Cross - Hull |
| 15 - | 1A04 07:00 Hull - Kings Cross. 1L43 14:05 King's Cross - York. 1A31 18:14 York - King's Cross. |
| s16 - | 1L41 10:05 Kings Cross - York (via Cambridge). 1A10 15:50 York - Kings Cross. Finsbury Park TMD. Stopped 21:45 - boiler burner motor u/s. To traffic 23:20. |
| 17 - | |
| 18 - | 1L41 10:05 Kings Cross - York. 1A22 14:11 York - Kings Cross |
| 19 - | |
| 20 - | Finsbury Park TMD. Stopped 11:00 - 'C' exam. |
| 21 - | Finsbury Park TMD. 'C' exam. |
| 22 - | Finsbury Park TMD. 'C' exam. |
| s23 - | Finsbury Park TMD. 'C' exam. To traffic 12:15. 1S72 22:40 Kings Cross - Edinburgh. |
| 24 - | Haymarket TMD. Repairs. |
| 25 - | Haymarket TMD. 1E08 08:25 Edinburgh - Newcastle. 1S50 13:20 Newcastle - Edinburgh. Haymarket TMD. 1E35 20:20 Edinburgh - Kings Cross |
| 26 - | 1D00 08:05 King's Cross - Hull. 1A18 12:34 Hull - King's Cross. Finsbury Park TMD. 1D08 19:35 King's Cross - Hull. 0D01 Hull - Doncaster. |
| 27 - | 0B05 Doncaster - Peterborough. 1B50 07:50 Peterborough - Kings Cross. Finsbury Park TMD. Stopped 12:15 - windscreen wipers. To traffic 18:00. 1D08 19:35 King's Cross - Hull. |
| 28 - | 1E10 10:45 Edinburgh - York (load 5).
P.Ref (1S27 07:25 Plymouth - Edinburgh, from York). 1E26 16:30 Aberdeen - York, from Edinburgh. |
| 29 - | 1M62 08:49 York -
Liverpool (first visit to Liverpool). 1E99 13:05 Liverpool - York. 1Gxx 17:40 York - King's Cross "Merrymaker". |
| s30 - | Finsbury Park TMD. Stopped 21:00 - earth on lights. |
October
| 1 - | Finsbury Park TMD. Repairs. To traffic 12:15. 1D08 19:35 Kings Cross - Hull. 0D01 Hull - Doncaster |
| 2 - | 0A02 Doncaster - Grantham. 1A02 08:00 Grantham - King's Cross. Finsbury Park TMD. 1L44 16:05 King's Cross - York. 1A34 19:56 York - King's Cross. |
| 3 - | 1D01 08:20 King's
Cross - Cleethorpes. 1A21 13:17 Cleethorpes - King's Cross. Finsbury Park TMD. 1S66 20:15 Kings Cross - Edinburgh. PIC |
| 4 - | Haymarket TMD. 1E08 08:25 Edinburgh - Newcastle. Gateshead TMD. |
| 5 - | Gateshead TMD. |
| 6 - | 1M67 09:28 Newcastle -
Liverpool. 1E88 16:05 Liverpool - Newcastle. |
| s7 - | |
| 8 - | Haymarket TMD. 1V93 09:50 Edinburgh - Plymouth, to York. 1S27 07:25 Plymouth - Edinburgh, from York. Haymarket TMD. |
| 9 - | 1A08 08:05 York - Kings Cross. 1L44 16:05 Kings Cross - York. |
| 10 - | 1E26 16:30 Aberdeen - York, from Edinburgh. |
| 11 - | 1A08 08:05 York - Kings Cross. Finsbury Park TMD. 'B' exam and boiler repairs - white window surrounds applied. |
| 12 - | Finsbury Park TMD. 'B' exam. (TOPS: expect OK 10:00 13/10). |
| 13 - | Finsbury Park TMD. 'B' exam. |
| s14 - | Finsbury Park TMD. 'B' exam. |
| 15 - | Finsbury Park TMD. 'B' exam. To traffic 19:30. |
| 16 - | 1M58 08:14 Newcastle -
Liverpool. 1E74 14:05 Liverpool - Newcastle. |
| 17 - | 1D00 08:05 Kings Cross - Hull. 1A18 12:45 Hull - Kings Cross |
| 18 - | 1E08 08:25 Edinburgh -
Newcastle. 1S50 13:20 Newcastle - Edinburgh. Haymarket TMD. 1E40 19:25 Aberdeen - Kings Cross, from Edinburgh. |
| 19 - | 1L42 12:20 Kings Cross - York. 1A26 15:50 York - King's Cross. 1N11 22:45 Kings Cross - Newcastle. |
| 20 - | 1S14 08:10 Newcastle - Edinburgh. Haymarket TMD. 1E29 17:07 Edinburgh - Newcastle. 1A40 21:00 Newcastle - King's Cross. PIC |
| s21 - | Finsbury Park TMD. 1L43 16:05 King's Cross - York. York TMD. |
| 22 - | York TMD. |
| 23 - | York TMD. 1A08 08:05 York - King's Cross. P.Ref Finsbury Park TMD. Stopped 13:20 - brake blocks. To traffic 20:15. 1S79 23:15 Kings Cross - Aberdeen, to Edinburgh. |
| 24 - | Haymarket TMD. 1V93 09:50 Edinburgh - Plymouth, to York. 1S27 07:25 Plymouth - Edinburgh, from York. |
| 25 - | 1S60 20:00 King's Cross - Aberdeen, (to Newcastle). |
| 26 - | 1S12 05:50 King's Cross - Aberdeen, to
Edinburgh. Haymarket TMD. 1E43 20:35 Aberdeen - King's Cross, from Edinburgh. |
| 27 - |
Finsbury Park TMD. Stopped 09:00 - speedometers. To traffic 14:00. 1S66 21:00 Kings Cross - Edinburgh. |
| s28 - | Haymarket TMD. 1V93 11:20 Edinburgh - Plymouth, to York (47422 forward). 1S27 06:40 Plymouth - Edinburgh, from York. |
| 29 - | (1D02 12:05 King’s Cross - Hull). 1A28 16:30 Hull - King’s Cross. |
| 30 - | |
| 31 - | 1L41 10:05 Kings Cross - York. 1A22 14:11 York - Kings Cross |
November
| 1 - | 1D04 17:05 King's Cross - Hull, "The Hull Executive". |
| 2 - | 1D02 12:05 Kings Cross - Hull. 1A28 16:30 Hull - Kings Cross |
| 3 - | Haymarket TMD. |
| s4 - | 1E48 21:15 Aberdeen - King's Cross, from Edinburgh. |
| 5 - | 1D03 13:05 King's
Cross - Cleethorpes. 1A32 17:46 Cleethorpes - King's Cross (21 minute delay Huntingdon). Casualty report states: ETH defect - unable to obtain power until one engine shut down. Finsbury Park TMD. |
| 6 - | Finsbury Park TMD. Stopped 01:00 - no power, unable to fault - to traffic 03:00. Locomotive presumably performed out and back from King's Cross with Chief Inspector accompanying. CM&EE representative Mr Edwards checked in traffic and reported TDR relay defective - Doncaster were unable to provide replacement relay, so relay adjusted by Mr Edwards and locomotive given further test run and found satisfactory (this second run is assumed to be 19/11). Stopped 17:00 - repairs & 'B' exam. |
| 7 - | Finsbury Park TMD. 'B' exam. |
| 8 - | Finsbury Park TMD. 'B' exam. |
| 9 - | Finsbury Park TMD. 'B' exam. |
| 10 - | Finsbury Park TMD. 'B' exam. |
| s11 - | Finsbury Park TMD. 'B' exam. |
| 12 - | Finsbury Park TMD. 'B' exam. |
| 13 - | Finsbury Park TMD. 'B' exam. |
| 14 - | Finsbury Park TMD. 'B' exam. |
| 15 - | Finsbury Park TMD. 'B' exam. |
| 16 - | Finsbury Park TMD. 'B' exam. |
| 17 - | Finsbury Park TMD. 'B' exam. |
| s18 - | Finsbury Park TMD. 'B' exam. |
| 19 - | Finsbury Park TMD. 'B' exam - to traffic 14:00. |
| 20 - | |
| 21 - | Finsbury Park TMD. |
| 22 - | 1B50 07:50 Peterborough - Kings Cross. |
| 23 - | 1L44 16:05 King's Cross - York. 1A34 19:56 York - Kings Cross. |
| 24 - | 1S12 05:50 King's Cross - Aberdeen, to
Edinburgh. Haymarket TMD. 1E26 16:30 Aberdeen - York, from Edinburgh. |
| s25 - | York TMD. |
| 26 - | (1A14 10:45 Leeds -
King's Cross (vice HST)). 1L12 14:50 King's Cross - Leeds (vice HST). |
| 27 - | 1A12 09:10 Harrogate - King's Cross (vice HST). |
| 28 - | |
| 29 - | 1A14 10:45 Leeds -
King's Cross (vice HST). 1L12 14:50 King's Cross - Leeds (vice HST). |
| 30 - | 1A14 10:45 Leeds -
King's Cross (vice HST). 1L12 14:50 King's Cross - Leeds (vice HST). |
December
| 1 - | Holbeck TMD. |
| s2 - | Holbeck TMD. |
| 3 - | 1A14 10:45 Leeds -
King's Cross (vice HST - restricted to ETH only). Finsbury Park TMD. Stopped 15:45 - 'C' exam, (TOPS: expect OK 18:00 06/12). |
| 4 - | Finsbury Park TMD. 'C' exam. |
| 5 - | Finsbury Park TMD. 'C' exam. |
| 6 - | Finsbury Park TMD. 'C' exam. |
| 7 - | Finsbury Park TMD. 'C' exam. |
| 8 - | Finsbury Park TMD. 'C' exam. To traffic 14:00. 1L22 23:15 King's Cross - Bradford. |
| s9 - | York TMD. 0M01 York - Tinsley. 1Z79 08:00 Marylebone - Doncaster, "The Yorkshire Terrier" from Tinsley (ex 76014 & 76030). 1Z79 18:30 Doncaster - Birmingham New Street, "The Yorkshire Terrier" to Canonbury Jn (25129 & 25263 forward). |
| 10 - | 1A13 09:35 Hull - King's Cross. 1L44 16:05 King's Cross - York. 1A34 19:56 York - Kings Cross. |
| 11 - | Finsbury Park TMD. 1S66 20:15 King's Cross - Edinburgh. |
| 12 - | Haymarket TMD. 1V93 09:50 Edinburgh - Plymouth, to York. |
| 13 - | 1D00 08:05 King's
Cross - Hull. 1A18 12:45 Hull - King's Cross. Finsbury Park TMD. 1L22 23:00 King's Cross - Bradford, to Leeds. |
| 14 - | Finsbury Park TMD. Stopped 16:45 - brake blocks. To traffic 19:30. |
| 15 - | 1A04 07:00 Hull - Kings Cross. Finsbury Park TMD. 'LD 125' exam. 1S72 22:30 King's Cross - Edinburgh, to Carlisle (via Joint Lines, Stockton & Carlisle - 81 minute delay Carlisle). Casualty report states: short of fuel - locomotive to depot for fuel. |
| s16 - | 0S72 Carlisle - Kingmoor. Kingmoor TMD. Loco fuelled - 187 gallons supplied to minimise delay (tank still not full). 0S72 Kingmoor - Carlisle. 1S72 22:30 King's Cross - Edinburgh, from Carlisle (ex King's Cross 15/12 - via Carstairs & Haymarket). Haymarket TMD. 1Exx Edinburgh - King's Cross. |
| 17 - | 1L41 10:05 King's
Cross - York. 1A22 14:11 York - King's Cross. |
| 18 - | |
| 19 - | 1Z41 22:32 York - Manchester (additional parcels). |
| 20 - | 1E26 02:15 Manchester - Leeds. 1Mxx York - Liverpool. 1E88 16:05 Liverpool - Newcastle. Finsbury Park TMD. Stopped 22:05 - speedometers. |
| 21 - | Finsbury Park TMD. Repairs. To traffic 00:01. Haymarket TMD. 1V93 09:50 Edinburgh - Plymouth, to York. 1S27 07:25 Plymouth - Edinburgh, from York. Haymarket TMD. 1E35 20:20 Edinburgh - King's Cross. |
| 22 - | |
| s23 - | 1N12 00:05 Kings Cross - Newcastle. Gateshead TMD. 1A45 22:55 Newcastle - Kings Cross, to York (7 minute delay York - unknown what worked forward). Casualty report states: Low fuel alarm showing. |
| 24 - | York TMD. Repairs - wire replaced from Niphon connection to float switch. |
| 25 - | York TMD. Repairs. |
| 26 - | York TMD. Repairs. 1A26 15:50 York - King's Cross. |
| 27 - | 1E61 09:10 Dundee - Kings Cross (relief). |
| 28 - | Haymarket TMD. 1V93 09:50 Edinburgh - Plymouth, to York. 1S27 07:25 Plymouth - Edinburgh, from York. Haymarket TMD. |
| 29 - | |
| s30 - | Gateshead TMD. 1A45 22:55 Newcastle - Kings Cross. |
| 31 - | Finsbury Park TMD. 1L41 10:05 King's Cross - York. PIC 1A22 14:11 York - King's Cross. Finsbury Park TMD. Stopped 20:00 - amps fluctuating. |
55012
(1978).....55012 (1980)
1979.....HOME