55012 - 1978

55012 (1977).....55012 (1979)

January

Click for current timetable

Deltic Diagrams

s1 - Finsbury Park TMD.
Stopped 08:30 - brake blocks. To traffic 13:00.
2 - 1A11 08:30 Newcastle - King's Cross.
3 - 1S35 14:00 King’s Cross - Aberdeen, to Edinburgh.
Haymarket TMD.
4 - 1E13 13:00 Edinburgh - King's Cross.
5 - 1E13 13:00 Edinburgh - King's Cross.
Finsbury Park TMD.
Stopped 20:15 - 'B' exam.
6 - Finsbury Park TMD.
'B' exam.
7 - Finsbury Park TMD.
'B' exam. To traffic 03:30.
1S21 11:00 King’s Cross - Edinburgh (14 minute delay King's Cross).
Casualty report states; Lights defective - depot lighting changeover switch in wrong position (switch
altered to correct position)
.
Conclusions: 07.02.78 DME KX states: This was a case of mismanagement, the locomotive having just
been released from a 'B' examination at Finsbury Park and the staff forgetting to restore the switch to
its normal position
.
s8 - 1S33 13:00 King's Cross - Aberdeen, to Edinburgh.
9 - 1A29 15:55 York - King's Cross.
10 - 1N29 19:00 King's Cross - Newcastle.
11 -  
12 - 1A11 08:30 Newcastle - King's Cross.
13 - 1A48 05:45 Leeds - King's Cross.
Finsbury Park TMD.
Stopped 12:30 - brake blocks. To traffic 18:30.
14 - 1N27 18:00 King’s Cross - Newcastle.
s15 -  
16 -  
17 - Gateshead TMD.
Repairs - loss of coolant (no faults found)
.
1V50 19:30 Newcastle - Bristol, to York
.
York TMD.
Repairs - loss of coolant (no faults found)
.
18 - York TMD.
1A06 08:05 York - King's Cross, to Doncaster (13 minute delay Doncaster).
Casualty report states: No.2 engine cutting out & loss of coolant (suspect fractured liner)
.
Conclusions: 07.02.78 DME KX states: Locomotive returned to Finsbury park for further
examination where No.2 engine was found to be aerating
. In view of previous reports of trouble
locomotive should not have been released to normal traffic - I am forwarding a copy of this
casualty report to the DME 's Newcastle & Leeds in view of the fact their Depots had been
involved in the earlier troubles with this engine
.
0B02 Doncaster - Finsbury Park.
Finsbury Park TMD.
Stopped 22:00 - 'C' exam and No.2 power unit 538 aerating.
19 - Finsbury Park TMD.
'C' exam and repairs.
Locomotive taken out of traffic - awaiting works attention 11:00
.
To Doncaster Works - Unclassified repair.
No.2 power unit 538 aerating badly, loosing coolant and Dowty pump quill shaft to renew - 538
replaced by 457 (ex 55003) and the primary fan drive was replaced
.
20 - Doncaster Works.
21 - Released from Doncaster Works.
Doncaster TMD.
'A' exam
.
s22 - Doncaster TMD.
1S37 09:30 Doncaster - Edinburgh, to York (44 minute delay Shaftholme &  9 minute delay York - 47410 assist to York,  47528 fwd).
Casualty report states: Both engines shutting down
.
York TMD.
Repairs - No.2 circuit to check, showing discharge when No.2 engine started (wires crossed on No.2
auxiliary generator giving reverse polarity)
.
Locomotive taken out of traffic - awaiting works attention
.
23 - York TMD (08:30).
To Doncaster Works - Rectification.
Both power units shutting down , battery ammeter showing discharge with No.2 power unit 457
running - wires found to be crossed on No.2 auxiliary generator
.
24 - Released from Doncaster Works.
Doncaster TMD.
'A' exam
.
25 - Doncaster TMD.
0B07 Doncaster - Peterborough.
1B07 07:20 Peterborough - King's Cross, to Huntingdon (train caped).

Casualty report states: Fire in No.2 engine exhaust system - carbon/lub oil deposits caught fire in
exhaust drum
.
Conclusions: 23.03.78 DME KX states: This locomotive had been released from Doncaster Works
after No.2 power unit change on 23.01.78 and had stood spare at Doncaster on 24.01.78 before
coming light engine to Peterborough to pick up the 07:20 Peterborough - King's Cross working.
It had therefore been subject to considerable idling/low load running and under these circumstances
'Deltic' engines are prone to exhaust fires
.
Finsbury Park TMD.
Stopped 11:15 - repairs & 'C' exam.
26 - Finsbury Park TMD.
'C' exam.
27 - Finsbury Park TMD.
‘C’ exam - to traffic 14:30.
1N27 18:00 King’s Cross - Newcastle, "The Newcastle Executive".
28 - King's Cross Loco (06:15).
1S42 16:00 King's Cross - Edinburgh, "The Talisman".
s29 - 1E09 11:00 Edinburgh - King’s Cross.
30 - 1S42 16:00 King’s Cross - Edinburgh, "The Talisman".
Haymarket TMD.
31 - 1S17 10:00 King’s Cross - Edinburgh, "The Flying Scotsman".
Haymarket TMD.
1E26 17:00 Edinburgh - King’s Cross.

February

Click for current timetable

Deltic Diagrams

1 - Finsbury Park TMD.
Stopped 13:30 - brake blocks.
2 - Finsbury Park TMD.
Brake blocks. To traffic 01:00.
1S12 07:45 King's Cross - Edinburgh (vice HST).
3 - 1Nxx King's Cross - Newcastle. PIC
4 - Gateshead TMD.
1A15 09:20 Newcastle - King's Cross.
Finsbury Park TMD.
Stopped 16:40 - AWS u/s. To traffic 19:15.
1S66 21:00 King's Cross - Edinburgh.
s5 - Haymarket TMD.
1E05 10:00 Edinburgh - King’s Cross.
1N29 19:00 King's Cross - Newcastle.
6 - 1S35 14:00 King’s Cross - Aberdeen, to Edinburgh.
Haymarket TMD.
7 - 1S21 11:00 King’s Cross - Edinburgh.
Haymarket TMD.
1E35 20:20 Edinburgh - King’s Cross.
8 - Finsbury Park TMD.
Stopped 08:00 - brake blocks. To traffic 13:00.
9 - 1E26 17:00 Edinburgh - King’s Cross.
10 - Finsbury Park TMD.
Stopped 06:00 - boiler u/s.
11 - Finsbury Park TMD.
Repairs. To traffic 05:00.
1S70 22:15 King's Cross - Aberdeen, "The Night Aberdonian" to Edinburgh. PIC
s12 -  
13 - 1E05 09:50 Edinburgh - King's Cross, "The Flying Scotsman".
14 - 1A07 07:25 Newcastle - King's Cross, "The Newcastle Executive".
Finsbury Park TMD.
Stopped 13:50 - brake blocks. To traffic 20:00.
15 - Holbeck TMD.
1A03 07:30 Leeds - King's Cross, "The Leeds Executive" (forward 07:55 after 55002 failed at Leeds).
1S35 14:00 King’s Cross - Aberdeen, to Edinburgh.
Haymarket TMD.
16 -  
17 -  
18 - KX fuelling dispute north-bound Deltic departures stepping back at York.
1N08 09:00 King's Cross - Newcastle.
1E13 13:00 Edinburgh - King’s Cross, from Newcastle.
s19 -  
20 - 1A11 08:30 Newcastle - King's Cross.
1S42 16:00 King’s Cross - Edinburgh, "The Talisman".
Haymarket TMD.
21 - Finsbury Park TMD.
Stopped 09:00 - brake blocks. To traffic 21:00.
22 - Finsbury Park TMD.
Stopped 19:30 - 'B' exam.
23 - Finsbury Park TMD.
'B' exam.
24 - Finsbury Park TMD.
'B' exam - to traffic 03:30.
1S16 08:00 King's Cross - Edinburgh, to Newcastle (18 minute delay Newcastle - 47409 forward).
Casualty report states: ETH cutting out
.
Conclusions: 16.05.78 DME KX states: I have checked the subsequent history of this locomotive
and can find no further booking of ETH trouble. I can only assume that there was a fault on the
coaching stock or mismanagement of operating staff
.
Gateshead TMD.
Repairs - ETH tested and unable to fault
.
(1Axx Newcastle - King's Cross).
25 - Finsbury Park TMD.
Stopped 05:00 - ETH faults.
s26 - Finsbury Park TMD.
Repairs. To traffic 11:30.
27 - Finsbury Park TMD.
Stopped 18:00 - AWS fault.
28 - Finsbury Park TMD.
Repairs. To traffic 13:00.
1N18 15:00 King’s Cross - Newcastle.

March

Click for current timetable

Deltic Diagrams

1 -  
2 - 1E13 13:00 Edinburgh - King's Cross.
1S70 22:15 King's Cross - Aberdeen, "The Night Aberdonian" to Edinburgh.
3 - Haymarket TMD.
1E11 08:45 Aberdeen - King's Cross, from Edinburgh.
1S66 20:15 King's Cross - Edinburgh.
4 - 1E01 08:00 Edinburgh - King's Cross.
1N29 19:00 King’s Cross - Newcastle.
s5 - 1A37 17:15 Newcastle - King's Cross.
6 - York TMD (08:30).
7 - Finsbury Park TMD.
Stopped 18:30 - 'D' exam & No.1 power unit 416 aerating.
8 - Finsbury Park TMD.
'D' exam.
9 - Finsbury Park TMD.
'D' exam.
10 - Finsbury Park TMD.
'D' exam.
11 - Finsbury Park TMD.
'D' exam.
s12 - Finsbury Park TMD.
'D' exam.
13 - Finsbury Park TMD.
'D' exam.
14 - Finsbury Park TMD.
'D' exam. For works attention 14:00.
15 - Finsbury Park TMD.
16 - To Doncaster Works - Unclassified repair.
Power units No.1 416 suspect fractured liner & No.2 457 'B' bank exhaust bellows robbed for
55003 - 416 replaced by 405, 457 repaired and No.2 boiler water tank had repairs to outer skin
.

Doncaster Works (yard - minus units).
17 - Doncaster Works.
18 - Doncaster Works.
s19 - Doncaster Works.
20 - 1st Scheduled HST service on ECML: 07:45 KX - Edinburgh.
Doncaster Works (weigh house - brake tests).
21 - Doncaster Works.
22 - Released from Doncaster Works.
23 - King's Cross Loco.
24 - 1N42 23:55 King's Cross - Newcastle.
25 - Gateshead TMD.
1A22 10:48 Newcastle - King's Cross.
1N29 19:00 King’s Cross - Newcastle.
s26 - Gateshead TMD.
1A15 08:36 Newcastle - King’s Cross.
1L37 18:45 King's Cross - Bradford.
27 - Finsbury Park TMD.
Stopped 14:00 - M8A valve. To traffic 15:00.
28 - Finsbury Park TMD.
Stopped 09:45 - brake blocks. To traffic 20:30.
29 - 1L00 01:15 King's Cross - Leeds.
1A03 07:30 Leeds - King's Cross, "The Leeds Executive".
30 - Haymarket TMD.
1E17 10:35 Aberdeen - King’s Cross, "The Aberdonian" from Edinburgh.
31 - 1S17 10:00 King’s Cross - Edinburgh, "The Flying Scotsman".
Haymarket TMD.

April

Click for current timetable

Deltic Diagrams

1 - 1N27 18:00 King’s Cross - Newcastle.
s2 - 1E05 10:00 Edinburgh - King’s Cross.
Finsbury Park TMD.
Stopped 23:30 - 'B' exam.
3 - Finsbury Park TMD.
'B' exam.
4 - Finsbury Park TMD.
'B' exam. To traffic 21:30.
5 - 1A03 07:30 Leeds - King’s Cross, "The Leeds Executive".
6 - 1A15 09:20 Newcastle - King's Cross.
7 - 1D62 03:56 Doncaster - Hull.
1A02 06:50 Hull - King's Cross, "The Hull Executive".
1S32 12:15 King’s Cross - Aberdeen, "The Aberdonian" to Edinburgh.
Haymarket TMD.
1E35 20:20 Edinburgh - King’s Cross
8 - 1S16 08:00 King’s Cross - Edinburgh.
Haymarket TMD.
1E25 16:00 Edinburgh - King’s Cross, "The Talisman".
s9 - 1S17 10:00 King’s Cross - Aberdeen, to Edinburgh (via Cambridge).
Haymarket TMD.
10 -  
11 - Finsbury Park TMD.
Stopped 04:30 - brake blocks. To traffic 13:30.
12 - Finsbury Park TMD.
Stopped 02:00 - brake u/s. To traffic 10:30.
13 - 1S35 14:00 King’s Cross - Aberdeen, to Edinburgh.
Haymarket TMD.
14 - 1E13 13:00 Edinburgh - King’s Cross.
15 - Haymarket TMD.
1E01 08:00 Edinburgh - King’s Cross.
1S42 16:00 King’s Cross - Edinburgh, "The Talisman".
Haymarket TMD.
1Exx Edinburgh - King's Cross.
Assumed flashover as booked repairs at Finsbury Park until 19.04.78
.
s16 - Finsbury Park TMD.
Stopped 11:00 - Flashover repairs & 'B' exam.
17 - Finsbury Park TMD.
'B' exam.
18 - Finsbury Park TMD.
'B' exam.
19 - Finsbury Park TMD.
'B' exam - to traffic 13:00.
1S66 20:15 King's Cross - Edinburgh.
20 - Haymarket TMD.
1E01 08:00 Edinburgh - King’s Cross, to Newcastle (10 minute delay Newcastle - 47435 forward).
Casualty report states: wheelslip indication above 60 mph
.
Conclusions: 22.05.78 DME KX states: This locomotive had been at Finsbury Park for flashover
repairs until 19.04.78, there was no attention given to No.3 traction motor. The electrician
responsible for repair is clearly at fault - this individual has now left the service
.
Gateshead TMD.
Repairs - several brushes in No.3 traction motor below scrapping size & traction motor dirty
(traction motor cleaned and new brushes fitted)
.
21 - Gateshead TMD.
Repairs
.
22 - Gateshead TMD.
1A15 09:20 Newcastle - King’s Cross.
1L34 18:04 King's Cross - Bradford.
s23 - 1A08 08:10 Bradford - King's Cross.
1N27 17:00 King’s Cross - Newcastle.
Gateshead TMD.
24 - Gateshead TMD.
1A07 07:25 Newcastle - King's Cross, "The Newcastle Executive".
1S33 13:00 King’s Cross - Edinburgh.
Haymarket TMD.
'A' exam
.
1Exx Edinburgh - King's Cross.
25 - 1N08 09:00 King's Cross - Newcastle.
1E13 13:00 Edinburgh - King's Cross, from Newcastle.
1S66 20:15 King's Cross - Edinburgh.
26 - Haymarket TMD.
1E01 08:00 Edinburgh - King’s Cross (9 minute delay Edinburgh - 47553 forward).
Casualty report states: DSD application - brake overcharge defective (dirt in choke)
.
Haymarket TMD.
Repairs - brake overcharge choke cleaned
.
1E17 10:35 Aberdeen - King's Cross, from Edinburgh, "The Aberdonian".
1S79 23:35 King's Cross - Edinburgh, "The Night Scotsman".
27 - Haymarket TMD.
1E17 10:35 Aberdeen - King's Cross, from Edinburgh, "The Aberdonian" (12 minute delay Newcastle).
Casualty report states: No.2 end windscreen wipers defective - general wear and tear in windscreen
wiper linkage (locomotive turned in order to work to King's Cross)
.
Conclusions: 13.07.78 DME KX states: The modification as now being applied in main works will
overcome this persistent problem with the wiper drive mechanism
.
King's Cross Loco.
Repairs - No.2 end windscreen wiper linkage repaired
.
1Sxx King's Cross - Edinburgh.
28 - Haymarket TMD.
1E11 08:45 Aberdeen - King’s Cross, from Edinburgh.
1S95 20:07 King’s Cross - Edinburgh, to Newcastle.
29 - Gateshead TMD.
0D01 Gateshead - Doncaster.
Doncaster TMD.
Tyre turning.
0B01 Doncaster - King's Cross, (to?).
1Axx  - King's Cross (assisting failed 47504 into King's Cross).
1N27 18:00 King’s Cross - Newcastle.
Gateshead TMD.
s30 - Gateshead TMD.
1A15 08:36 Newcastle - King's Cross.
1L29 16:05 King's Cross - York.

May

Click for current timetable

Deltic Diagrams

1 - 1S12 07:45 King’s Cross - Edinburgh (vice HST).
Haymarket TMD.
2 - Haymarket TMD.
1E11 08:45 Aberdeen - King’s Cross, from Edinburgh.
3 - Finsbury Park TMD.
Stopped 17:00 - 'C' exam, clean and paint.
4 - Finsbury Park TMD.
'C' exam, clean and paint.
5 - Finsbury Park TMD.
'C' exam, clean and paint.
6 - Finsbury Park TMD. P.Ref
'C' exam, clean and paint.
s7 - Finsbury Park TMD.
'C' exam, clean and paint. To traffic 13:00.
(1D06 16:30 King's Cross - Hull).
8 - New timetable period (HST service begins)
1A04 06:50 Hull - King's Cross, "The Hull Executive" (inaugural service with black headboard).
1D04 16:42 King's Cross - Hull, "The Hull Executive"
.
9 - 1S21 10:55 King's Cross - Newcastle.
10 - 1A27 16:20 Harrogate - King’s Cross.
11 -  
12 -  
13 - 1S24 11:55 King’s Cross - Aberdeen, "The Aberdonian" to Edinburgh. PIC
Haymarket TMD.
s14 -  
15 - 1E21 17:00 Edinburgh - King’s Cross.
16 - 1A06 08:05 York - King's Cross.
17 - Finsbury Park TMD.
Stopped 23:30 - 'B' exam and clean.
18 - Finsbury Park TMD.
'B' exam and clean.
19 - Finsbury Park TMD.
'B' exam and clean. To traffic 23:45.
20 - 1Zxx 08:40 King's Cross - Leeds, "East Coast Pullman Salute" (farewell to Pullman services on ECML). PIC
1Zxx 07:55 St. Pancras - Edinburgh, "The Thames-Forth Express" from Leeds (ex 25131 & 25302 - via S&C route). P.Ref
Haymarket TMD.
s21 - Haymarket TMD.
1E03 10:10 Edinburgh - King’s Cross, (vice HST - via Carlisle). PIC P.Ref
22 -  
23 - 1S31 15:00 King’s Cross - Aberdeen, to Edinburgh.
Haymarket TMD.
24 -  
25 - 1A11 08:20 Newcastle - King's Cross. PIC
1S31 15:00 King's Cross - Aberdeen, to Edinburgh.
Haymarket TMD.
26 - Finsbury Park TMD.
Stopped 10:00 - brake blocks. To traffic 17:00.
1L21 19:40 King's Cross - Leeds.
27 - 1S11 07:30 Leeds - Edinburgh.
Haymarket TMD.
1E17 15:10 Edinburgh - King’s Cross.
s28 - 1L04 09:40 King's Cross - Leeds.
1L07 12:40 King's Cross - Harrogate, from Leeds. P.Ref
1A16 17:10 Harrogate - King's Cross. P.Ref
29 - 1A11 08:20 Newcastle - King’s Cross.
1S31 15:00 King's Cross - Aberdeen.
30 - 1S21 10:55 King’s Cross - Edinburgh.
31 - 1E21 17:00 Edinburgh - King’s Cross.

June

Click for current timetable

Deltic Diagrams

1 - 1N06 17:35 King's Cross - Newcastle, "The Newcastle Executive".
2 - 1E14 10:40 Aberdeen - King’s Cross, "The Aberdonian" from Edinburgh.
3 - 1E05 09:00 Edinburgh - King’s Cross.
s4 -  
5 - 1E21 17:00 Edinburgh - King's Cross.
6 - 1L09 12:45 King’s Cross - Bradford.
1A30 17:30 Bradford - King’s Cross. P.Ref
7 - 1E29 17:10 Edinburgh - Newcastle.
8 - To Doncaster Works - Unclassified repair.
No.1 power unit 405 con rod through 'B-C' crankcase - power units No1 405 replaced by 451 & No.2
457 had a gudgeon pin housing examination, No.2 boiler water tank had a leak rectified and No.1
coolant radiators were cleaned
.

Doncaster Works (yard).
9 - Doncaster Works (4 bay Crimpsalls). PIC
10 - Doncaster Works (4 bay Crimpsalls).
s11 - Doncaster Works (4 bay Crimpsalls).
12 - Doncaster Works (4 bay Crimpsalls).
13 - Doncaster Works (4 bay Crimpsalls).
14 - Doncaster Works (weigh house).
15 - Doncaster Works (4 bay Crimpsalls).
Released from Doncaster Works.
16 -  
17 -  
s18 - 1A03 09:15 Bradford - King's Cross, from Leeds (via Knottingley).
Finsbury Park TMD.
Stopped 17:00 - 'B' exam and No.1 power unit 451 cut out.
19 - Finsbury Park TMD.
'B' exam and repairs.
20 - Finsbury Park TMD.
'B' exam and repairs.
21 - Finsbury Park TMD.
'B' exam and repairs. To traffic 15:30.
22 - 1E05 09:00 Edinburgh - King's Cross. PIC
1S34 18:00 King’s Cross - Edinburgh.
23 -  
24 - Finsbury Park TMD.
Stopped 02:40 - brake u/s. To traffic 05:30.
Stopped 07:40 - unit to secure (element). To traffic 09:00.
1S24 11:55 King’s Cross - Aberdeen, "The Aberdonian" to Edinburgh.
Haymarket TMD.
s25 - 1L06 10:40 King's Cross - Bradford, to Leeds.
1A11 15:50 Leeds - King's Cross.
26 - Finsbury Park TMD.
Stopped 00:15 - AWS u/s. To traffic 04:30.
1S17 09:00 King's Cross - Edinburgh.
Haymarket TMD.
27 - 1S28 13:00 King's Cross - Edinburgh.
Haymarket TMD.
28 - 1S17 09:00 King’s Cross - Edinburgh.
29 - 1E21 17:00 Edinburgh - King's Cross. PIC
30 -  

July

Click for current timetable

Deltic Diagrams

1 - King's Cross Loco.
1S17 09:00 King's Cross - Edinburgh.
PIC
Haymarket TMD.
s2 - Finsbury Park TMD.
Stopped 22:45 - 'B' exam.
3 - Finsbury Park TMD.
'B' exam.
4 - Finsbury Park TMD.
'B' exam. To traffic 20:15.
Stopped 23:15 - speedometers.
5 - Finsbury Park TMD.
Repairs. To traffic 03:30.
1S16 08:00 King’s Cross - Edinburgh.
Haymarket TMD.
1E21 17:00 Edinburgh - King's Cross.
6 - 1S24 11:55 King's Cross - Aberdeen, "The Aberdonian" to Edinburgh. PIC
Haymarket TMD.
1E35 20:20 Edinburgh - King's Cross.
7 - 1S16 08:00 King's Cross - Edinburgh.
Haymarket TMD.
1E21 17:00 Edinburgh - King’s Cross.
8 - 1L15 16:08 King's Cross - York.
York TMD.
s9 -  
10 - 1E21 17:00 Edinburgh - King’s Cross.
11 -  
12 - Finsbury Park TMD.
Stopped 21:30 - 'C' Exam.
13 - Finsbury Park TMD.
'C' exam.
14 - Finsbury Park TMD.
'C' exam.
15 - Finsbury Park TMD.
'C' exam.
s16 - Finsbury Park TMD.
'C' exam - FP Register states to traffic 03:30
.
17 - Finsbury Park TMD.
Casualty report dated 21.08.78 states loco off 'C' exam
.

Holbeck TMD.
0D57 23:58 Holbeck - Leeds.
18 - 1D57 00:40 Leeds - Doncaster.
1D62 03:56 Doncaster - Hull.
1A04 06:50 Hull - King's Cross, "The Hull Executive".
King's Cross Loco.
1S28 13:00 King's Cross - Edinburgh, to Newcastle (53 minute delay Peterborough and 17 minutes at Newcastle - 47519 forward).
Casualty report states:
No.2 engine cut out.
Conclusions: 21.08.78 DME KX states: The only other possible relevant trouble with this locomotive
was a flashover three days later after which the No.2 generator insulation reading was found to be
only 600 K.ohms
. A special shopping proposal has been submitted
.
Gateshead TMD.
Repairs - engine de-isolated and started immediately, locomotive returned to King's Cross without
further trouble
.
1Axx Newcastle - King's Cross.
19 -  
20 -  
21 - Finsbury Park TMD.
Stopped 11:00 - main generators flashed over.
Shopping proposal submitted for attention to No.2 main generator (no attention given until No.1
engine swapped at Doncaster 04.09.78 - assumed this was cancelled following repairs at Finsbury Park)
.
22 - Finsbury Park TMD.
Repairs.
s23 - Finsbury Park TMD.
Repairs - to traffic 10:00.
1Lxx King's Cross - Leeds.
1A18 18:50 Leeds - King's Cross.
24 -  
25 - 1D62 03:56 Doncaster - Hull.
1A04 06:50 Hull - King's Cross, "The Hull Executive".
Finsbury Park TMD.
Stopped 12:50 - brake blocks.
26 - Finsbury Park TMD.
Brake blocks - to traffic 05:00.
1L06 10:45 King's Cross - Harrogate.
1A27 16:20 Harrogate - King's Cross.
27 - 1N12 23:55 King's Cross - Newcastle.
28 - 1E14 10:40 Aberdeen - King's Cross, "The Aberdonian" from Edinburgh. 
29 - Haymarket TMD.
1E11 09:00 Aberdeen - King’s Cross, from Edinburgh. PIC
s30 -  
31 - 1L09 12:45 King's Cross - Bradford.

August

Click for current timetable

Deltic Diagrams

1 -  
2 -  
3 - 1E01 07:05 Edinburgh - King's Cross.
Finsbury Park TMD.
Stopped 14:20 - 'B' exam
4 - Finsbury Park TMD.
'B' exam.
5 - Finsbury Park TMD.
'B' exam - to traffic 18:00.
s6 -  
7 -  
8 - 1E05 09:00 Edinburgh - King's Cross.
King's Cross Loco.
1S34 18:00 King’s Cross - Edinburgh.
9 - 1S34 18:00 King's Cross - Edinburgh.
10 - 1A33 18:55 Leeds - King's Cross.
11 - Haymarket TMD.
1E14 10:40 Aberdeen - King’s Cross, "The Aberdonian" from Edinburgh.
12 - King's Cross Loco.
0B02 King's Cross - Finsbury Park.
Finsbury Park TMD - noted 18:00.
s13 - 1S28 13:00 King's Cross - Aberdeen, to Edinburgh.
Haymarket TMD.
14 -  
15 - Haymarket TMD. P.Ref
1E21 17:00 Edinburgh - King's Cross.
16 - Finsbury Park TMD.
Stopped 15:00 - 'B' exam.
17 - Finsbury Park TMD.
'B' exam.
18 - Finsbury Park TMD.
'B' exam - to traffic 22:00.
1S79 23:45 King's Cross - Aberdeen, to Edinburgh (18 minute delay King's Cross).
Casualty report states: only 19" of vacuum - snifter valves out of adjustment (snifter valve reset to
21" at King's Cross)
.
Conclusions: 27.09.78 DME KX states: This was the locomotive's first working after release form a
'B' examination. The fitter concerned has been suitably spoken to
.
19 - Haymarket TMD.
1E14 10:40 Aberdeen - King's Cross, "The Aberdonian" from Edinburgh. PIC
s20 - 1S31 15:00 King's Cross - Edinburgh.
21 -  
22 - (1S17/1S21/1S31 or 1N06 - stopped Doncaster for crew change).
23 - 1E35 20:20 Edinburgh - King's Cross.
24 - Haymarket TMD.
1E21 17:00 Edinburgh - King's Cross.
25 -  
26 - 1A20 12:57 Bradford - King’s Cross.
1L18 18:09 King's Cross - York.
s27 -  
28 - Haymarket TMD.
'A' exam
.
1E05 09:00 Edinburgh - King’s Cross. P.Ref
King's Cross Loco.
1S34 18:00 King's Cross - Edinburgh.
Haymarket TMD.
29 - Haymarket TMD.
1E01 07:05 Edinburgh - King’s Cross.
King's Cross Loco.
1S31 15:00 King's Cross - Aberdeen, to Edinburgh.
Haymarket TMD.
1E43 20:20 Aberdeen - King's Cross, from Edinburgh to Newcastle (18 minute delay N'castle - 47460 fwd 30/08).
Casualty report states: No.1 engine shutting down (hole in crankcase)
.
Interestingly DME KX state that No.1 power unit 406 was fitted during an unclassified repair at
Doncaster Works on 13.12.77 - this was actually 55007
.
30 - Gateshead TMD.
Locomotive restricted to one power unit only - proposed for main works attention.
31 - Haymarket TMD.
1E06 11:50 Edinburgh - Newcastle.

September

Click for current timetable

Deltic Diagrams

1 - 1E06 11:50 Edinburgh - Newcastle.
2 - 1S12 05:50 King's Cross - Aberdeen, to Edinburgh.
s3 -  
4 - To Doncaster Works - Unclassified repair.
No.1 power unit 451 'CA' Crankcase holed and cardan shaft and clutch was loose, windscreen wiper
linkage at both ends needed renewal and No.1 bogie 9000-31 No.1 right-hand leading axle box liner
was loose - 451 replaced by 422 and all other faults rectified
.

Doncaster Works (yard).
5 - Doncaster Works (4 bay Crimpsalls).
6 - Doncaster Works (4 bay Crimpsalls - unit fitted).
Released from Doncaster Works.
7 -  
8 - Finsbury Park TMD.
Stopped 13:00 - 'B' exam.
9 - Finsbury Park TMD.
'B' exam.
s10 - Finsbury Park TMD.
'B' exam.
11 - Finsbury Park TMD.
'B' exam.
12 - Finsbury Park TMD.
'B' exam. To traffic 07:00.
13 - 1E11 09:00 Aberdeen - King’s Cross, from Edinburgh.
14 -  
15 - 1A29 16:16 Newcastle - King’s Cross.
1S72 22:30 King's Cross - Edinburgh.
16 - Haymarket TMD.
1E11 09:00 Aberdeen - King’s Cross, from Edinburgh.
s17 - 1E07 12:10 Edinburgh - King's Cross. LOG
18 - Haymarket TMD.
1E14 10:40 Aberdeen - King’s Cross, "The Aberdonian" from Edinburgh.
19 - Finsbury Park TMD.
Stopped 00:20 - 'D' exam.
20 - Finsbury Park TMD.
'D' exam.
21 - Finsbury Park TMD.
'D' exam.
22 - Finsbury Park TMD.
Casualty report dated 20.11.78 states loco off 'D' exam.
23 - Finsbury Park TMD.
'D' exam - FP register states to traffic 22:00.
s24 -  
25 -  
26 -  
27 - 1S21 10:55 King’s Cross - Edinburgh. P.Ref
Haymarket TMD.
1E35 20:20 Edinburgh - King's Cross.
28 -  
29 -  
30 - Haymarket TMD.
1E14 10:40 Aberdeen - King’s Cross, "The Aberdonian" from Edinburgh.
Finsbury Park TMD.
Stopped 22:30 - brake blocks.

October

Click for current timetable

Deltic Diagrams

s1 - Finsbury Park TMD.
Brake blocks. To traffic 01:00.
1Lxx King's Cross - Leeds.
1A11 15:50 Leeds - King's Cross.
2 - 1L13 15:45 King's Cross - Leeds, "The Leeds Executive".
1A33 18:55 Leeds - King's Cross.
3 -  
4 - Haymarket TMD.
1E14 10:40 Aberdeen - King’s Cross, "The Aberdonian" from Edinburgh.
1L22 23:00 King's Cross - Bradford.
5 - 1A10 08:40 Leeds - King's Cross.
Finsbury Park TMD.
Stopped 13:30 - 'B' exam and special clean.
6 - Finsbury Park TMD.
'B' exam and clean.
7 - Finsbury Park TMD.
'B' exam and clean. To traffic 05:30.
1L06 10:45 King's Cross - Harrogate, to Leeds.

0J01 Leeds - Barrow Hill.
Barrow Hill TMD.
s8 - Barrow Hill TMD.
Open day exhibit
.
9 - 0D01 Barrow Hill - Doncaster (towed by 56001, with 56020). PIC
Doncaster TMD.
10 -  
11 -  
12 -  
13 - 1A08 08:00 York - King’s Cross.
King's Cross Loco. PIC
1N04 13:25 King’s Cross - Newcastle.
14 - 1A11 08:20 Newcastle - King's Cross.
s15 -  
16 -  
17 - King's Cross Loco.
'A' exam
.
1Sxx King's Cross - Edinburgh.
Haymarket TMD.
1Exx Edinburgh - King's Cross.
18 - King's Cross Loco.
1S21 10:55 King's Cross - Edinburgh (25 minute delay en-route).
Casualty report states: low power - No.1 & 2 ACC valves & No.2 ETH sped up valve passing air
.
Conclusions: 22.11.78 DME KX states: The defective component was handed to the CM&EE
representative, Mr. Craven, during his visit to Finsbury Park Depot on 09.11.78. These items fail
occasionally but there is no real epidemic problem
.
Haymarket TMD.
Repairs - No.2 engine governor bellows leaking, loco kept on diagram for attention at home depot
.
1E39 22:30 Edinburgh - King's Cross.
19 - Finsbury Park TMD.
Stopped 08:00 - loss in power (No,2 engine governor bellows renewed). To traffic 15:00.
20 - 1N06 17:35 King’s Cross - Newcastle, "The Newcastle Executive".
Gateshead TMD.
21 - Gateshead TMD.
1A11 08:20 Newcastle - King's Cross.
1S31 15:00 King's Cross - Aberdeen, to Edinburgh.
Haymarket TMD.
s22 - Haymarket TMD.
1E05 11:10 Edinburgh - King’s Cross.
23 - 1L15 16:08 King’s Cross - York.
24 - 0L50 02:25 Leeds - Holbeck.
Holbeck TMD.
1A30 17:30 Bradford - King's Cross.
25 - 1E21 17:00 Edinburgh - King's Cross.
26 - Finsbury Park TMD.
Stopped 01:00 - 'B' exam and main generator flashed over.
27 - Finsbury Park TMD.
'B' exam and repairs. To traffic 15:00.
1Sxx King's Cross - Edinburgh.
28 - Hexthorpe Bridge (noted 08:12).
Awaiting Works.
To Doncaster Works - Unclassified repair.
No.2 power unit 457 time expired - 457 replaced by 455 and No.2 load regulator had an oil leak rectified.
s29 - Doncaster Works.
30 - Doncaster Works (4 bay Crimpsalls - power unit changed).
31 - Doncaster Works (test house).

November

Click for current timetable

Deltic Diagrams

1 - Released from Doncaster Works (officially 31/10).
(0B01 Doncaster - King's Cross).
1S34 18:00 King's Cross - Edinburgh, to Doncaster (42 minute delay Doncaster - 31410 forward).
Casualty report states: Bad oil leak from No.2 engine - No.2 bogie and first three coaches of train
covered in oil (this was found to be the sump oil drain plug adrift)
.
2 - To Doncaster Works - Rectification.
No.2 power unit 455 scavenge pump defective - sump drain pipe repaired and oil cleaned from No.2
bogie 9000-32
.

Released from Doncaster Works.
3 - 1N06 17:35 King’s Cross - Newcastle, "The Newcastle Executive".
4 - 1A11 08:20 Newcastle - King's Cross.
1S31 15:00 King's Cross - Edinburgh, to Newcastle (47499 forward)
.
Gateshead TMD.
s5 -  
6 -  
7 - 1E14 10:40 Aberdeen - King’s Cross, "The Aberdonian" from Edinburgh.
8 - 1E21 17:00 Edinburgh - King’s Cross
9 -  
10 - 1N05 15:25 King’s Cross - Newcastle.
1E43 20:20 Aberdeen - King's Cross, (from Newcastle).
11 - 1Lxx King's Cross - Leeds.
5Lxx Leeds - Neville Hill. P.Ref
s12 -  
13 - Finsbury Park TMD.
Stopped 09:45 - fuelling pipe u/s. To traffic 15:30.
1N09 19:04 King's Cross - Newcastle.
14 -  
15 - Finsbury Park TMD.
Stopped 16:00 - 'B' exam.
16 - Finsbury Park TMD.
'B' exam.
17 - Finsbury Park TMD.
'B' exam.
18 - Finsbury Park TMD.
'B' exam. To traffic 10:45.
1S28 13:00 King’s Cross - Edinburgh.
Haymarket TMD.
s19 -  
20 -  
21 -  
22 - 1S66 20:15 King's Cross - Edinburgh.
23 - Haymarket TMD.
1Exx Edinburgh - King's Cross.
Finsbury Park TMD.
Stopped 23:30 - main generators and traction motors flashed over.
24 - Finsbury Park TMD.
Repairs.
25 - Finsbury Park TMD.
Repairs - to traffic 03:30.
1S28 13:00 King's Cross - Edinburgh.
Haymarket TMD.
1E39 22:30 Edinburgh - King's Cross (13 minute delay Peterborough 26/11).
Casualty report states: short of boiler water - boiler water topped up (due to diversions/delays)
.
s26 - Finsbury Park TMD.
Stopped 11:30 - brake blocks. To traffic 19:00.
27 - 1E14 10:40 Aberdeen - King’s Cross, "The Aberdonian" from Edinburgh.
28 - Haymarket TMD.
1E14 10:40 Aberdeen - King’s Cross, "The Aberdonian" from Edinburgh.
29 - 1E14 10:40 Aberdeen - King’s Cross, "The Aberdonian" from Edinburgh.
30 - Finsbury Park TMD.
Stopped 02:00 - 'C' exam.

December

Click for current timetable

Deltic Diagrams

1 - Finsbury Park TMD.
'C' exam - to traffic 20:00.
2 - 1A15 10:20 Newcastle - King's Cross.
1L15 16:08 King's Cross - York.
s3 -  
4 - 1S31 15:00 King’s Cross - Aberdeen, to Edinburgh.
Haymarket TMD.
5 -  
6 - Finsbury Park TMD.
Stopped 00:15 - brake blocks. To traffic 05:30.
7 -  
8 - 1S21 10:55 King's Cross - Edinburgh.
Haymarket TMD.
9 - 1S17 09:00 King's Cross - Edinburgh.
Haymarket TMD.
s10 - Finsbury Park TMD.
Stopped 23:55 - brake blocks.
11 - Finsbury Park TMD.
Brake blocks. To traffic 04:00.
12 - 1E21 17:00 Edinburgh - King’s Cross.
13 - 1D01 08:25 King's Cross - Cleethorpes.
1A21 13:18 Cleethorpes - King's Cross.
14 -  
15 - 1L06 10:45 King’s Cross - Harrogate.
1A27 16:20 Harrogate - King's Cross.
16 - Finsbury Park TMD.
Stopped 00:15 - 'B' exam.
s17 - Finsbury Park TMD.
'B' exam.
18 - Finsbury Park TMD.
'B' exam.
19 - Finsbury Park TMD.
'B' exam.
20 - Finsbury Park TMD.
'B' exam - to traffic 13:00.
1L12 14:45 King's Cross - Leeds.
21 - 1S79 23:45 King's Cross - Aberdeen, to Edinburgh (47208 forward).
22 - Haymarket TMD.
23 - 1L06 10:45 King's Cross - Harrogate.
(1A25 15:40 Leeds - King's Cross).
1S72 22:30 King's Cross - Edinburgh.
s24 - Haymarket TMD.
25 -  
26 - 1E40 19:30 Aberdeen - King's Cross, from Edinburgh.
27 - 1S17 09:00 King's Cross - Edinburgh.
28 -  
29 - 1E01 07:05 Edinburgh - King’s Cross.
Finsbury Park TMD.
Stopped 14:15 - brake blocks. To traffic 20:30.
1S72 22:30 King's Cross - Edinburgh.
30 -  
s31 -  

55012 (1977).....55012 (1979)
1978.....HOME